India  

WR completes first phase of rebuilding of bridge between Mahim, Bandra stations

Mid-Day Friday, 7 February 2025 ()
The rebuilding of Bridge No 20 is essential for passenger safety and the strength of the railway structure. The south abutment, which had weakened over time owing to outdated technology, has now been reconstructed using modern methods and structural designs
0
shares
ShareTweetSavePostSend
 

You Might Like