Major water pipeline damaged during metro work, Mumbai faces day-long disruption
Saturday, 19 April 2025 () A 1200 mm diameter water pipeline was damaged during ongoing metro construction work at the junction. As a result, the BMC has had to shut down the adjoining 1800 mm main water pipeline to carry out urgent repair operations